Specialist service

Apartment handover inspection service in Di An

We check every item before you sign, so you know the apartment's real condition and have evidence to raise with the developer.

Technician inspecting an apartment

Why inspect

Small defects at handover, big hassles after you move in

Once the handover record is signed, warranty repairs often take weeks to months. Inspecting before you sign gets defects into the record from day one.

◎

Hard to spot by eye

Reversed socket polarity, missing earth wires, hollow tiles. These need measuring tools to detect.

◷

Show up once you live there

Leaking trap joints, bathroom floors without enough fall, gaps in door seals.

⌛

Repairs after signing are slow

Waiting for fixes after handover can delay your interior work and move-in date.

▤

Clear evidence

A report with a photo and location for every defect, so you can ask for fixes before you sign.

Checklist

What we inspect

A full 89-point checklist in 8 groups. Below are the key points of each group.

1. Doors & locks

  • Front door, room doors, bathroom doors
  • Locks, hinges, handles
  • Seals and rubber gaskets

2. Walls – ceilings – floors

  • Wall and ceiling surfaces, paint
  • Tiles, grout, floor slope
  • Cracks, damp, peeling

3. Electrical system

  • Distribution board, breakers, MCBs
  • Sockets, switches, lights
  • Electrical fittings and wiring

4. Water & sanitary

  • Water pressure, drainage
  • Basins, toilets, showers
  • Leak and waterproofing checks

5. Windows & balcony

  • Glass, aluminium frames, sliding tracks
  • Railings, handrails
  • Loggia and drainage

6. Kitchen & appliances

  • Kitchen cabinets, stone worktop, hinges
  • Sink and drain
  • Handed-over appliances, if any

7. Air conditioning – ventilation

  • Unit positions and pipework
  • Exhaust fans, service openings
  • Ventilation and vents

8. Other items

  • Accessories, loose items
  • Handover documents
  • Your specific requests

Japanese-style care

How Nha Chuan inspects your apartment

Tidy, clean and transparent in the spirit of 5S, in every apartment.

①

5S discipline, a protected site

We lay floor mats and wear shoe covers inside your apartment. Tools stay organised and the work area is cleaned before we leave.

②

4-colour microfiber cloths

Each area has its own cloth colour, so dirt and germs are not carried from one area to another.

③

Proper measuring tools

Laser meter, ELCB (earth-leakage breaker) tester and a tapping hammer for hollow tiles. Defects are recorded with measurements and locations.

④

89-point report on the same day

We inspect against a full 89-point checklist. The report shows a photo and location for every defect and is sent to you on the day of the inspection.

Process

From survey to report

01

Intake

We note the project, block, floor area and handover date.

02

Remote survey

We review photos/videos and define the scope.

03

On-site inspection

Carried out with a checklist and proper tools.

04

Defect record

Location, severity and photo evidence.

05

Report delivery

We send a PDF and help explain the findings.

What you receive

  • A full 89-point checklist in 8 groups.
  • Defect photos with location notes.
  • Defects sorted by what must be fixed before you accept.
  • A PDF report sent on the day of the inspection.
  • Help explaining the findings to the developer.

Scope

What the inspection includes

Included

  • Inspection against a full 89-point checklist in 8 groups.
  • Measurements with a laser meter, ELCB tester and tapping hammer.
  • About 90–150 minutes on site, depending on size and condition.
  • A PDF report with photos, locations and defect priority, sent the same day.
  • Guidance on raising defects with the developer.

Not included

  • Repairs. We can quote separately if you need them.
  • Structural load-bearing assessment. This is a visual inspection with hand-held tools.
  • Re-inspection after the developer's repairs, charged separately as shown below.

Reference prices

Priced by floor area

Studio / 1-bed

700,000 VND

35–50 m²

3-bed / corner unit

1,100,000 VND

80–110 m²

Prices are for a standard inspection. Units outside the groups above, penthouses, duplexes or special requests: message us on Zalo or fill in the form for a quote within 4 working hours of receiving all details.

Re-inspection after the developer's repairs: 50% of the first inspection fee (350,000 / 450,000 / 550,000 VND). Want inspection and cleaning in one visit? See the inspection & cleaning package, cheaper than booking separately.

FAQ

Frequently asked questions

About 90–150 minutes, depending on size, handover condition and number of items.

Ideally at the start and the final check; you can authorise someone else if agreed in advance.

As a PDF or digital file with the checklist, photo evidence and suggested fixes, sent on the day of the inspection.

The technician records and classifies them and explains how to raise them with the developer. Repairs are not part of the inspection unless quoted separately.

Book a handover inspection

In a hurry? Call or message on Zalo 0908 269 673 (08:00–20:00 daily).

 

Ready for a worry-free handover?

Get advice on the right inspection, cleaning and finishing package for your apartment.

Book a consultation