Specialist service
Apartment handover inspection service in Di An
We check every item before you sign, so you know the apartment's real condition and have evidence to raise with the developer.

Why inspect
Small defects at handover, big hassles after you move in
Once the handover record is signed, warranty repairs often take weeks to months. Inspecting before you sign gets defects into the record from day one.
Hard to spot by eye
Reversed socket polarity, missing earth wires, hollow tiles. These need measuring tools to detect.
Show up once you live there
Leaking trap joints, bathroom floors without enough fall, gaps in door seals.
Repairs after signing are slow
Waiting for fixes after handover can delay your interior work and move-in date.
Clear evidence
A report with a photo and location for every defect, so you can ask for fixes before you sign.
Checklist
What we inspect
A full 89-point checklist in 8 groups. Below are the key points of each group.
1. Doors & locks
- Front door, room doors, bathroom doors
- Locks, hinges, handles
- Seals and rubber gaskets
2. Walls – ceilings – floors
- Wall and ceiling surfaces, paint
- Tiles, grout, floor slope
- Cracks, damp, peeling
3. Electrical system
- Distribution board, breakers, MCBs
- Sockets, switches, lights
- Electrical fittings and wiring
4. Water & sanitary
- Water pressure, drainage
- Basins, toilets, showers
- Leak and waterproofing checks
5. Windows & balcony
- Glass, aluminium frames, sliding tracks
- Railings, handrails
- Loggia and drainage
6. Kitchen & appliances
- Kitchen cabinets, stone worktop, hinges
- Sink and drain
- Handed-over appliances, if any
7. Air conditioning – ventilation
- Unit positions and pipework
- Exhaust fans, service openings
- Ventilation and vents
8. Other items
- Accessories, loose items
- Handover documents
- Your specific requests
Japanese-style care
How Nha Chuan inspects your apartment
Tidy, clean and transparent in the spirit of 5S, in every apartment.
5S discipline, a protected site
We lay floor mats and wear shoe covers inside your apartment. Tools stay organised and the work area is cleaned before we leave.
4-colour microfiber cloths
Each area has its own cloth colour, so dirt and germs are not carried from one area to another.
Proper measuring tools
Laser meter, ELCB (earth-leakage breaker) tester and a tapping hammer for hollow tiles. Defects are recorded with measurements and locations.
89-point report on the same day
We inspect against a full 89-point checklist. The report shows a photo and location for every defect and is sent to you on the day of the inspection.
Process
From survey to report
01
Intake
We note the project, block, floor area and handover date.
02
Remote survey
We review photos/videos and define the scope.
03
On-site inspection
Carried out with a checklist and proper tools.
04
Defect record
Location, severity and photo evidence.
05
Report delivery
We send a PDF and help explain the findings.
What you receive
- A full 89-point checklist in 8 groups.
- Defect photos with location notes.
- Defects sorted by what must be fixed before you accept.
- A PDF report sent on the day of the inspection.
- Help explaining the findings to the developer.
Scope
What the inspection includes
Included
- Inspection against a full 89-point checklist in 8 groups.
- Measurements with a laser meter, ELCB tester and tapping hammer.
- About 90–150 minutes on site, depending on size and condition.
- A PDF report with photos, locations and defect priority, sent the same day.
- Guidance on raising defects with the developer.
Not included
- Repairs. We can quote separately if you need them.
- Structural load-bearing assessment. This is a visual inspection with hand-held tools.
- Re-inspection after the developer's repairs, charged separately as shown below.
Reference prices
Priced by floor area
Studio / 1-bed
35–50 m²
Popular
2-bed
55–75 m²
3-bed / corner unit
80–110 m²
Prices are for a standard inspection. Units outside the groups above, penthouses, duplexes or special requests: message us on Zalo or fill in the form for a quote within 4 working hours of receiving all details.
Re-inspection after the developer's repairs: 50% of the first inspection fee (350,000 / 450,000 / 550,000 VND). Want inspection and cleaning in one visit? See the inspection & cleaning package, cheaper than booking separately.
FAQ
Frequently asked questions
Ready for a worry-free handover?
Get advice on the right inspection, cleaning and finishing package for your apartment.
